Capability statement · 2026

The last trade in. The first thing everyone sees.

Commercial furniture for workplaces and public spaces, delivered to programs that cannot move. Since 1981.

Who we are

We create commercial furniture, and we deliver it at the point in a project where there is no float left.

Burgtec has supplied workplaces and public spaces since 1981. We are family owned, we hold our own product data and manufacturing relationships, and we install with our own crews, which is why we can commit to a handover standard rather than hope for one.

Most of our work is the final package on site. Hundreds of workstations, thousands of chairs, and a date that was set before the slab was poured. Landing that without it becoming your problem is the capability this document describes.

45 years
Supplying commercial furniture since 1981
Single source
Workstations and loose furniture from one supplier
Own crews
In-house delivery and installation, not subcontracted labour
Zero LTIFR
Across the past three years, on every site
Western Sydney International Airport terminal seating by Burgtec
01 · What we supply

One supplier for the whole furniture package.

Our range is built to be modified rather than made from scratch, so it meets the specification without the cost and program risk that full custom carries.

Product

  • Workstations and screens
  • Task, meeting and executive seating
  • Soft and modular seating, booths and beam seating
  • Tables: meeting, collaborative and public
  • Storage, lockers and personal storage
  • Accessories, monitor arms, cabling and power

Where a floor plate calls for it, we modify standard product rather than starting again. It is faster, it costs less, and it holds its lead time. Seven frame colours are held in stock, with no minimum order.

Services

  • Space planning on your floor plate
  • 3D visualisation and live configuration
  • Sampling: full sets held ready, sit in it before production
  • Shop drawings issued for review and approval
  • Manufacture to approved drawings
  • Delivery staged to your sequence
  • Installation by our own crews
  • After sales: repairs, replacements and model matching for the life of the product

Where we work

Corporate, government and institutional workplaces, and large public spaces. Airports, council chambers and civic centres, government floors, corporate headquarters and universities. We do not chase full custom joinery, and we are not a fitout contractor. Furniture is the whole of what we do.

City of Gold Coast Council workplace fitout by Burgtec
02 · What we will put in the contract

The numbers, and where they come from.

98%
DIFOT: delivered in full and on time, measured on every project
Zero
LTIFR across the past three years
8 weeks
Standard lead time on our core range, from the date everything is signed off
10 years
Warranty on our core workstation, seating and table ranges
$9 million
Largest single package delivered: City of Gold Coast Council, 18 floors
2 days
Material sample turnaround, and four hours on a specification query

Why the delivery numbers hold

We hold the product.

Stock and finished goods sit at our end, so a change to your program does not arrive as a change to our price.

We install it ourselves.

In-house crews, not labour hire we have never met. That is why we can commit to a handover standard.

We measure every job.

DIFOT is recorded project by project, not estimated annually. We will show you the record.

City of Gold Coast Council workstations by Burgtec
03 · Project evidence

Seven projects.

The whole workstation and loose furniture package, delivered on the program.

Aviation · Public space

Western Sydney International Airport

Terminal 1 opened in 2025 across roughly 100,000m², and we delivered the entire furniture scope: waiting, lounge, retail, cafe, office and border protection zones. The package rolled out over nine months in stages that tracked terminal completion.

Getting there took an extensive collaborative design process with Multiplex, architect Woods Bagot and the client, developing a modified, fully compliant package that held the design intent while meeting strict performance, budget and program requirements.

Client
Western Sydney Airport
Builder
Multiplex
Specifier
Woods Bagot
Concept: Zaha Hadid Architects & Cox Architecture
Location · Completed
Badgerys Creek, NSW · 2025
1,900
Loose chairs
900
Beam seats
750
Lounges
450
Tables
200
Workstations
Lounge seating at Western Sydney International Airport
Terminal seating at Western Sydney International Airport
Lounge zone at Western Sydney International Airport
Local government

City of Gold Coast Council

Eighteen floors of the Bundall Office Campus brought back to life in 2025, with the entire workstation and loose furniture package supplied across three stages and three colour palettes, each stage landing on an eight-week program.

The scale demanded tight coordination and consistent quality run after run, so every floor handed over ready for staff to walk in and start work. Our largest single package to date at $9 million, delivered with the offices operating throughout.

Client
City of Gold Coast
Builder
SHAPE Australia
Specifier
Bearspace
Location · Completed
Bundall, QLD · 2025
4,900
Chairs
2,100
Workstations
750
Lounges
500
Tables
500
Storage units
City of Gold Coast Council meeting room
City of Gold Coast Council breakout seating
City of Gold Coast Council open plan workstations
State government

Galkangu · Bendigo GovHub

Victorian Government and City of Greater Bendigo teams brought together into one workplace on Lyttleton Terrace, opening in 2023 as the largest timber-framed building in Victoria. We supplied the entire workstation and loose furniture package for the office floors on a sixteen-week program.

The Lyons-designed building leaves its CLT floors and glulam posts exposed, so the furniture had to sit comfortably against warm structural timber and complex curved geometry, specified for a workplace built around daylight, sustainability and agile working for roughly 900 staff.

Client
Victorian Government
Builder
Icon-Fairbrother JV
Specifier
Lyons Architecture
Location · Completed
Bendigo, VIC · 2023
9,000m²
Scale
900
Staff accommodated
16 weeks
Program
Single
Source for the whole package
Largest
Timber-framed building in Victoria
Galkangu Bendigo GovHub timber interior
Galkangu Bendigo GovHub workstations
Galkangu Bendigo GovHub office floor
Local government

Wurriki Nyal Civic Precinct

The City of Greater Geelong's civic precinct brought council teams previously spread across nine separate offices into a single workplace overlooking Johnstone Park. We supplied all workstations, meeting chairs, tables and collaborative furniture across five office levels, roughly 9,400m² of A-Grade space for around 850 staff, on a twelve-week program.

The building uses a hybrid structure of concrete, steel and mass timber, with exposed CLT and glulam left visible throughout. The furniture package had to support genuinely collaborative ways of working while holding its own in a light-filled timber interior built to some of the country's toughest sustainability targets.

Client
City of Greater Geelong
Builder
BESIX Watpac
Specifier
Cox Architecture
Location · Completed
Geelong, VIC · 2022
9,400m²
A-Grade space
850
Staff accommodated
5
Office levels
12 weeks
Program
9 → 1
Offices consolidated into one
Wurriki Nyal Civic Precinct workstations
Wurriki Nyal Civic Precinct office floor
Wurriki Nyal Civic Precinct collaborative space
Local government · Public space

Hervey Bay City Centre Community Hub

Fraser Coast Regional Council's new civic heart at Pialba brings a two-level library, council administration offices, chambers, a disaster resilience centre and a public plaza together on one site. We supplied the entire workstation and loose furniture package, working closely with Hansen Yuncken to land a complex, multi-use scope on time and on budget.

A once-in-a-generation project for the region, where the furniture had to work as hard for staff at their desks as it does for the public using the library and plaza. We were retained as single-source supplier through an extensive value management process, working with the client and the designers to reach a solution that met both.

Client
Fraser Coast Regional Council
Builder
Hansen Yuncken
Specifier
Cottee Parker with Bloc Design
Location · Completed
Hervey Bay, QLD · 2026
9,000m²
Scale
$108.7m
Project value
5
Distinct use types in one building
Single
Source through value management
On time
And on budget
Hervey Bay City Centre Community Hub workstations
Hervey Bay City Centre Community Hub building
Hervey Bay City Centre Community Hub meeting room
Corporate headquarters

Glencore 727 HQ

Glencore's new Newcastle office sits inside 727 HQ on Hunter Street, the city's newest A-Grade commercial tower. We supplied the entire workstation and loose furniture package on a ten-week program, fully specified by EJE Architecture, across a fitout built by Core Project Group and linked by a new interconnecting stair cut into the base building.

The tenancy combines open-plan floors, private zones and meeting rooms with large breakout areas and kitchens, accommodating over 200 staff behind the building's curved double-glazed facade. Described by its builder as Newcastle's highest quality fitout, it demanded high-end finishes and a level of coordination to match.

Client
Glencore
Builder
Core Project Group
Specifier
EJE Architecture
Location · Completed
Newcastle, NSW · 2024
200+
Staff accommodated
2
Office floors
10 weeks
Program
Full
Workstation and loose package
A-Grade
New commercial tower
Glencore 727 HQ workstations
Glencore 727 HQ breakout area
Glencore 727 HQ boardroom
Corporate headquarters

Pillow Talk Headquarters

Pillow Talk's new Darra headquarters brings the homewares retailer's head office, photography and curation studios, warehousing and distribution together under one roof across three levels. We supplied the entire furniture package on a ten-week program, designed in close collaboration with the client and modified to carry the premium, residential feel that defines the brand.

Built by Hutchinson Builders to a Cottee Parker design, the building leans on curved forms, natural tones and timber accents, so front-of-house spaces like reception and the boardrooms had to read as considered and comfortable as the products the business sells.

Client
Pillow Talk
Builder
Hutchinson Builders
Specifier
Cottee Parker
Location · Completed
Darra, QLD · 2024
3
Levels of offices
10 weeks
Program
Full
Furniture package
Modified
To a residential aesthetic
One roof
Office, studios, warehousing
Pillow Talk Headquarters workstations
Pillow Talk Headquarters boardroom
Pillow Talk Headquarters breakout space
04 · Working under a head contract

By the time we arrive, the float is gone. We have built our delivery model around that.

Furniture is the last package on site, measured against a date that has not moved since the contract was signed. Every delay upstream compounds into our window. We plan for it rather than complain about it.

We work to your sequence, not our warehouse

Deliveries staged floor by floor, zone by zone, or out of hours where the site requires it. At WSI the rollout ran over nine months in stages that tracked terminal completion; at Gold Coast, three stages on eight-week cycles with the offices operating throughout.

Where a program is at risk, we move on site

On projects where base-build delays compressed the fitout window, we have established secure on-site compounds and delivered ahead of schedule to protect the handover date.

One contact, award to handover

A project manager takes ownership at award. They secure materials, lock the delivery schedule, issue shop drawings and remain your contact through installation and defects, with weekly updates. You will not be handed between departments.

Shop drawings and approvals, early

Drawings are issued for your review before anything goes into production, so what is supplied, how it is configured and when it lands are documented and agreed rather than assumed.

Value options priced before they become variations

Where the budget moves, we put up alternatives that hold the specification rather than quietly reducing it. At Hervey Bay that process kept us as single source and kept the designers' intent intact.

Handover without a defects list

We install, inspect, test and clear our own waste. Anything outstanding is closed before we leave the floor, and we carry repairs and replacements for the life of the product.

Burgtec installer at work
05 · On site

Our own crews, inducted and accountable.

Installation is carried out by people we employ, supported by a contractor pool we have worked with for years. That is the reason we can commit to a handover standard at all.

The crew

  • 10 in-house installers, including site leads and technicians
  • National contractor pool of 30 to 50 at peak
  • All installers hold white cards, plus silica, asbestos and other required training
  • Baseline security clearances held by key staff and by installers working on secure sites
  • Experience across defence, high-security and aerospace environments

Before we mobilise

  • SWMS and SOPs issued before mobilisation
  • Site inductions allowed for in every program. We treat them as non-negotiable, not as an impost
  • Delivery schedule and access requirements agreed with your site team
  • Protective packaging, loading and unloading planned to your access constraints
  • Waste removal and clean-up included as standard

Zero LTIFR across the past three years

Not a statement of intent. It is the record across every site we have worked on for three years: an operating airport terminal, civic buildings, government floors and commercial towers.

Burgtec crew member in the workshop
06 · Insurance, accreditation and prequalification

Everything your procurement team checks first.

InsuranceInsurerCoverExpiry
Public and products liabilityChubb$20 million30 April 2027
Professional indemnityDual$10 million5 January 2027
Workers compensationInsured in all states of Australia

Certificates of currency available on request.

Prequalification

  • NSW Government
  • NSW HealthShare
  • Industry Capability Network (ICN)
  • Local Buy

Certification

  • ISO 9001:2015, Quality management
  • ISO 45001:2018, Health and safety management
  • ISO 14001:2015, Environmental management
  • AFRDI, independent furniture testing and certification
  • Global GreenTag Level C
  • Supply Nation member

Certified, and audited

The ISO trio is externally certified rather than self-assessed, and it governs how we run a project rather than sitting in a drawer. Our quality inspection protocols are the reason product arrives on your floor ready to install rather than ready to be argued about.

Seat shells in production at the Burgtec factory
07 · Three ways we come onto a project

The scope, the standard and the price are the same in all three. What changes is who holds the contract.

Route one

Already specified

The designer has written us into the documents. Our pricing is transparent and our files are current, so what has been specified is what gets costed and what gets installed. No substitution exercise late in the program.

Glencore 727 HQ, Wurriki Nyal
Route two

Head contract or design and construct

You hold the contract and we supply to you. We work to your program, your site rules and your approval process, with one contact and documented staging. Where you need a value option that holds the design, we price it before it becomes a variation.

WSI Airport, Hervey Bay, Bendigo GovHub
Route three

Client direct, coordinated with you

The client contracts us directly and we coordinate with you on site. You keep visibility of the delivery schedule and the site interface without carrying the furniture package on your books.

City of Gold Coast, Pillow Talk

What does not change

  • One price story. The route does not change the number
  • One product platform, modified to the brief rather than built from scratch
  • One accountable contact, whoever holds the contract
  • One delivery standard: in full, on time, defect free

What it means for you

Most furniture suppliers are comfortable in one of these routes and awkward in the other two. We are set up for all three, which means the furniture package does not have to be restructured around how we prefer to work.

Hervey Bay City Centre Community Hub interior
08 · How a project runs

First call to handover, in seven stages.

How many apply depends on the route. Under a head contract, stages one to three usually sit with your design team, and we pick up from shop drawings.

01

Listen

We start with your program, your budget and how you would like to work with us. That first conversation shapes everything that follows.

02

Plan and specify

Where we are engaged directly, we help plan the space and build the specification with you, modifying standard product where the floor plate calls for it.

03

Sampling

With showrooms in each of our markets, you can see it and sign off on it before anything goes into production. This is the stage to change your mind, and plenty of people do.

04

Shop drawings

A project manager takes ownership, secures materials, locks the delivery schedule and issues drawings for review and approval.

05

Production

Approved drawings go into production, managed end to end with weekly updates from the same contact, and quality inspection before anything leaves.

06

Delivery

Staged to suit your site rather than our warehouse. Where a program is at risk we have used secure on-site compounds to deliver ahead of schedule.

07

Handover

Defect free, then audits, repairs and replacements for the life of the product. We recycle it at the end.

In our experience, things rarely go wrong because of the furniture

They go wrong because of an assumption that was not documented. So we spend a lot of effort at the start on the unglamorous part: agreeing who is doing what, and when.

Talking early. Contacts, approvals, milestones and site interface agreed at the outset.

Writing it down. Schedules, shop drawings and sign-off points, so nothing is left to assumption.

Planning it properly. Procurement, lead times, staging, access, loading and installation handled as one process.

09 · The team

The people who will be on your project.

A named project manager, client services contact and delivery lead are assigned at award. Above them sits a leadership group that is close enough to the work to be useful when something needs a decision.

Leadership
Joel Kennard
Joel Kennard
Director
Nathan Kennard
Nathan Kennard
Director
Oliver Kennard
Oliver Kennard
Director
Andy McCulloch
Andy McCulloch
Head of Sales
Michael Blatchford
Michael Blatchford
Head of Project Delivery
Sam Pierozzi
Sam Pierozzi
Head of Brand
Corne du Plooy
Corne du Plooy
Head of Finance
Client principals
Kevin Self
Kevin Self
Client Principal, NSW
Mauro Vecchi
Mauro Vecchi
Client Principal, ACT
Luke Allaway
Luke Allaway
Client Principal, NZ
Project, client services and support
Christie Hinton
Christie Hinton
Client Services Manager
Mira Ohm
Mira Ohm
Project Coordinator
Matt Taylor
Matt Taylor
Project Design Lead
Kathryn Moore
Kathryn Moore
Senior Estimator
Ben Froome
Ben Froome
Product Technician
Arsalan Yasin
Arsalan Yasin
IT & Systems Team Leader
10 · Specification support and stewardship

Easy to specify. Built to be kept.

For your design team

  • Revit, SketchUp and DWG files for almost every product, downloadable without a form
  • Live configuration and pricing: modify the product, see it in 3D, price it as you go
  • Finishes, fabrics and laminates curated into one palette, so materials are resolved together rather than matched afterwards
  • Samples in two working days, and a four-hour response on specification queries

After handover

  • Ten-year warranty on core workstation, seating and table ranges
  • LifeTrack: an optional ten-year extension on Strata+ workstations, under LifeTrack terms
  • PFAS and PVC-free options on Strata+
  • Designed for disassembly: repair, refurbishment and recycling when the time comes
  • Model matching and remanufacture for growth or space changes

Talk to us

Send the floor plate and the date you need to be in. We will come back with a layout, a price and a lead time. If you already have drawings and a specification, we will work from those.